The UAE has introduced a new civil code that now sits at the centre of how commercial obligations are read and enforced. For international businesses, this has real day to day consequences. It affects contracts signed outside the UAE when there’s a UAE link through governing law, where the work’s carried out or where rights may need to be enforced.

This article looks at how the new code works in practice and what it means for commercial contracts agreed abroad that later touch the UAE.

What changed and why it matters

The new UAE Civil Transactions Law replaces the previous framework that many international parties had relied on for decades. While much of the structure will feel familiar, the wording’s been updated and some ideas are now expressed more directly.

What matters in practice isn’t where a contract was signed but how it connects to the UAE. If UAE law governs the contract, or performance takes place in the UAE, or a dispute ends up before UAE courts, the new code will shape the outcome. That applies equally to agreements signed in London, Singapore or New York.

We often see parties assume that a foreign signing location keeps them outside the UAE legal system. That assumption’s now harder to rely on because the courts focus on how and where a contract actually operates.

When the UAE civil code applies to foreign-signed contracts

A contract signed abroad can fall under the UAE civil code in several common situations. The clearest case is where the governing law clause points to UAE law. In that situation, the new code applies in full, regardless of where the parties signed.

The code can also apply where the contract’s silent on governing law and the place of performance is in the UAE. Supply agreements, distribution arrangements or service contracts carried out on the ground in the UAE often fall into this category.

Enforcement is another point where UAE law comes into play. If a party needs to pursue payment, secure assets or take court action in the UAE, the courts will look to the new code when assessing what each side owes, what remedies are available and whether any time limits apply. This can catch foreign counterparties off guard, especially where they’d assumed their home law would govern the dispute from start to finish.

Good faith and contract interpretation

One area that continues to shape outcomes is the requirement to act in good faith. Under UAE law, this is a practical obligation rather than a general principle sitting in the background.

In real terms, it gives the courts room to look at how a contract was performed, not just how it was written. Judges may consider the conduct of the parties, their understanding at the time of signing and whether one side pushed its advantage too far. For contracts drafted overseas with hard edged clauses, that can lead to results that feel unfamiliar.

The same approach applies to interpretation. Rather than relying only on literal wording, the courts can look at the shared intention behind the agreement. Where language is unclear, they may adopt a reading that reflects how the relationship was meant to work, even if a similar clause would be enforced more strictly under English or New York law.

So for contracts signed abroad, standard templates shouldn’t be assumed to operate in the same way once UAE law becomes relevant.

Damages, penalties and agreed sums

Many international contracts rely on liquidated damages or pre agreed penalty amounts. Under the new UAE civil code, these clauses are generally recognised, but they’re not immune from review.

If an agreed sum bears little relation to the loss actually suffered, the court can adjust it. Equally, where losses go beyond the agreed amount, compensation can be increased unless the contract clearly restricts recovery. This reflects the civil law approach and remains part of how the courts operate.

For foreign parties, this means caps and penalties don’t always deliver the certainty they might expect elsewhere. Drafting needs to take this into account, particularly for high value supply or construction related contracts with a UAE connection.

Limitation periods and time bars

The new code keeps specific limitation periods for bringing claims, and these don’t always match those under foreign laws. UAE courts tend to apply these periods strictly.

It’s possible for a claim to remain live under a foreign governing law but already be out of time under UAE rules. This often arises with older contracts signed abroad where disputes only surface once performance or enforcement moves into the UAE.

We regularly recommend reviewing existing agreements to check whether claim periods line up with UAE requirements, especially where enforcement in the UAE may become necessary.

Termination and force majeure

Termination under the new code follows a measured approach. Ending a contract unilaterally is usually limited unless the right’s clearly agreed or there’s a serious breach. Even then, the way notice is given and whether the response is proportionate can affect the outcome.

Force majeure’s treated as a legal concept in its own right, not just whatever the contract says. The courts can recognise exceptional events that make performance impossible or unreasonably difficult, even where the contractual wording is tight.

For contracts signed abroad during unsettled periods, including the pandemic years, these rules can reopen arguments that parties assumed were settled.

Assignment, novation and third parties

The new code sets out clearer rules on assignment and novation. As a general position, obligations can’t be transferred without consent unless the contract allows it. Rights are easier to assign but notice requirements and formal steps still need to be followed.

Third party rights exist but remain limited compared to some common law systems. This can affect financing arrangements, guarantees and group structures where foreign contracts assume wider third party enforcement.

For cross-border groups, gaps between what a contract assumes and what UAE law permits can slow transactions or weaken enforcement.

What this means for existing contracts

For contracts already signed abroad, the new code doesn’t automatically undo what’s been agreed. What it does change is how those contracts will be read and applied once the UAE becomes involved after the law came into force.

We’re seeing growing value in early reviews. These focus on governing law, dispute resolution, damages clauses and termination mechanics against the new code. In many cases, modest changes or clarifications can reduce uncertainty before problems arise.

Leaving these points until enforcement’s required usually narrows the options and increases cost.

How The Knightsbridge Group can help

With over ten years advising international businesses and families, The Knightsbridge Group supports clients across the UAE and worldwide.

We work across legal, tax and immigration and fiduciary planning, so contract structuring’s considered in its wider commercial and regulatory setting. That often involves coordinating with foreign counsel, trustees, banks and local legal partners to ensure agreements signed abroad will operate as intended in the UAE.

We assist with contract reviews, restructuring and dispute readiness under the new civil code, including enforcement planning and risk reduction for existing arrangements.

To review your current arrangements or plan new strategies, contact info@kbgroup.ae

Search

Category

Recent Posts

Book a Consultation


[contact-form-7 id="863e51a" title="Book a Consultation"]

This will close in 0 seconds